{"id":10639,"date":"2020-01-18T05:58:31","date_gmt":"2020-01-18T05:58:31","guid":{"rendered":"https:\/\/dailyhomeland.com\/?p=10639"},"modified":"2020-01-18T05:58:31","modified_gmt":"2020-01-18T05:58:31","slug":"first-unit-of-payra-power-plant-generating-100mw-electricity","status":"publish","type":"post","link":"https:\/\/dailyhomeland.com\/?p=10639","title":{"rendered":"First unit of Payra power plant generating 100MW electricity"},"content":{"rendered":"<p>The first unit of 1320 MW Payra coal-fired<br \/>\npower plant went into test operation today.<\/p>\n<p>\u201cThe plant is now generating 100MW power . . . the production will go up to<br \/>\n660MW when it will go into full operation,\u201d said a power division official.<\/p>\n<p>The unit, put into operation utilising the 400 kV Payra-Gopalganj power<br \/>\ntransmission, was commissioned on December 31 for evacuating power from the<br \/>\npower plant, said the official.<\/p>\n<p>The plant is being developed by Bangladesh China Power Company (BCPCL); a<br \/>\n50:50 joint venture between China National Machinery Import and Export (CMC)<br \/>\nand Bangladesh\u2019s state-owned North-West Power Generation Company (NWPGCL).<\/p>\n<p>The $2bn Payra power project is financed through 30 percent equity<br \/>\ninvestment provided by BCPCL partners and 70 percent debt provided through<br \/>\nloan from Chinese banks led by Chinese Export Import (Exim) Bank.<\/p>\n<p>The power plant will consist of two 660MW ultra-supercritical coal-fired<br \/>\npower generating units.<\/p>\n<p>The coal requirement for the plant is estimated to be 4.12 million tonnes<br \/>\nper year (Mt\/y), which will be imported from Indonesia, China and Australia.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The first unit of 1320 MW Payra coal-fired power plant went into test operation today. \u201cThe plant is now generating 100MW power . . . the production will go up to 660MW when it will go into full operation,\u201d said a power division official. The unit, put into operation utilising the 400 kV Payra-Gopalganj power [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10642,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false},"categories":[42,51,48],"tags":[],"jetpack_featured_media_url":"http:\/\/www.bssnews.net\/wp-content\/uploads\/2019\/02\/power-2.jpg","jetpack_publicize_connections":[],"_links":{"self":[{"href":"https:\/\/dailyhomeland.com\/index.php?rest_route=\/wp\/v2\/posts\/10639"}],"collection":[{"href":"https:\/\/dailyhomeland.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dailyhomeland.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dailyhomeland.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dailyhomeland.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10639"}],"version-history":[{"count":1,"href":"https:\/\/dailyhomeland.com\/index.php?rest_route=\/wp\/v2\/posts\/10639\/revisions"}],"predecessor-version":[{"id":10641,"href":"https:\/\/dailyhomeland.com\/index.php?rest_route=\/wp\/v2\/posts\/10639\/revisions\/10641"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dailyhomeland.com\/index.php?rest_route=\/wp\/v2\/media\/10642"}],"wp:attachment":[{"href":"https:\/\/dailyhomeland.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10639"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dailyhomeland.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10639"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dailyhomeland.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10639"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}